Instal. GAL
28 / 40
VERO DESIGN NV © all rights reserved +32 33 85 06 91
Installation instructions Operating instructions
G
A
L
A
Installation
not using convection
system
The appliance has to be covered with insulation (all blue marked areas), including the connection pieces for
the air. The repercusion safety on the back of the fireplace remains free.
Build in the appliance as mentionned on the previous pages, with exception of the grilles.
After GALA has been build in, you can’t ingnite the appliance immediately.
The duration for the materials to dry can take upto 4 weeks.
Pay attention to the instructions of your professional dealer !
Commentaires sur ces manuels